Shoulder units beside a corridor job
Units set on the shoulder beyond the barrier, close to the active zone and out of the traffic lane. They suit a long corridor job with a steady crew.
Portable toilets for Detroit road and bridge crews, moved with the work zone and kept clear of the traffic lanes and the crane routes.
Fastest: call (888) 351-0294. Or send this and we call you back.
Road and bridge crew restrooms are portable toilets moved along a work zone as lanes close, reopen and shift. Crews on the reported I-696 and Gratiot Avenue bridge work in Detroit need units within reach of the active zone. Detroit Porta Potty Rental plans each move with the contractor and keeps units clear of live traffic across Wayne County.
A road or bridge crew works in a narrow strip of the road, beside live traffic, with machines moving past at arm's length. The toilet cannot stand where the work is, and it cannot stand in the lane the crew needs next week. The placement is a moving target, and it has to be planned as one.
In Detroit several major jobs are running. The I-696 eastbound closure has been reported to run until November 2026, the Gratiot Avenue bridge over the Dequindre Cut has a reported span of work from summer 2026 to February 2027, and the I-94 reconstruction between I-275 and Michigan Avenue is reported to run through 2029. Each has its own closures and its own phases.
A road crew's toilet plan follows the closures. The crew's shift times, the lane closures and the route the truck takes to reach each unit are the three things to agree first, and then the units move in step with the work.
Beyond the barrier, on the shoulder, or inside a closed lane, on firm and level ground. The unit must stay clear of the live traffic lane, the crane route and the truck turning area, and it must not block a sight line for the road users.
A shoulder unit is the simplest answer, but the shoulder is often narrow and used by the trucks. A closed lane gives more room but has to be cleared before the closure lifts. Check each spot against the traffic plan and the crane route, and mark the unit so the crew can find it and the drivers can see it. The traffic control plan is the document that decides the placement.
Each time the work zone moves, which can be every few weeks on a corridor job and more often on a bridge job with short phases. Each move is planned with the closure schedule so the crew keeps a unit within reach at all times.
On a long corridor the work advances in steps, and the units follow. A move that is timed badly leaves a crew without a toilet for an hour, so the move is booked for a closure change or a quiet period. Keep the old and new positions on the traffic plan, and record each move so the service visits follow the unit's current position.
The count follows the crew's headcount and the rule that applies. Michigan's construction sanitation rule has a headcount ratio and a note on mobile crews, which the 2008 legislative summary treats as exempt when they travel with transport. The current rule should be checked for each job.
A road crew that moves daily can look like a mobile crew, but the units are still needed at the work zone where the crew is working. Ask the provider and the contractor to agree the count against the current text before the job starts. Keep the written count with the traffic control plan so an inspector can see it at any point on the corridor.
Units on a bridge job or at a deep cut stand on a firm pad with a clear route for the crew, away from the edge and the crane lift. The pad is checked before the job starts and again after heavy work, since vibration and rain can move a unit that was level on the first day.
Keep a unit off the edge of a cut or a deck, with a barrier between it and the drop. The route to the unit should be level and lit for the shift. A bridge crew that works over water may need a unit at the approach rather than on the structure, so the placement is agreed with the engineer and the contractor.
Keep every unit beyond the barrier and out of the live lane, and never walk a crew across live traffic to reach one. Do not let a service truck back into a work zone without a spotter. If a unit is hit or the barrier is breached, stop work in that zone, clear the area and call (888) 351-0294.
Ask for the lane closures, the work zones and the crew's shifts. The closure plan sets where the units can stand and when they are moved.
Units stand on the shoulder, in a closed lane or in a work area beyond the barrier, on firm, level ground and clear of the crane and truck routes.
Each move is agreed with the contractor and timed for a closure change or a quiet period. The crew is never left without a unit during the move.
Visits are timed for the gap between shifts, when the lane is closed or the traffic is light, so the service truck does not hold up the work.
Units are collected when a phase closes, and the final pumping is recorded. A septage company pumps the waste under Michigan's Part 117 rules.
Units set on the shoulder beyond the barrier, close to the active zone and out of the traffic lane. They suit a long corridor job with a steady crew.
Units placed inside a closed lane for the length of the closure. They are moved when the closure moves, so the move is timed with the lane plan.
Units on a bridge approach or at the edge of a deep cut, placed on a firm pad where the crew can reach them without crossing the work. The pad and the route are checked before the job starts.
Call any hour and explain what is going on. You get a clear price before any work starts.
Gratiot Avenue crosses the Dequindre Cut on the east side, and a bridge job there sits between active rail-trail users and the traffic lanes. The units are placed on the outside of the work area, away from the trail.
The I-696 closure runs through the northern suburbs of the city, where the freeway is busy and the shoulders are narrow. Units are placed beyond the barrier on the shoulder and out of the truck route.
The I-94 work between I-275 and Michigan Avenue runs through the west and southwest of the city, where the lanes and the industrial yards meet. A crew there needs units placed on the yard edges as well as the shoulders.
Portable toilets sized to the crew and placed across Detroit construction sites, serviced on a schedule the job can plan around.
Portable toilets rented for months or years on a Detroit project, serviced on a steady schedule and moved as the work moves.
Portable toilets for Detroit warehouses, plants and industrial yards, set clear of forklift lanes and loading docks and counted to each shift.
How Detroit portable toilets are delivered, levelled and placed, with the spot, the route and the access agreed before the truck leaves the yard.
Not sure if you're covered? Check your ZIP code.
Michigan construction sites are counted under MIOSHA construction Rule 129, which ties the number of toilets to headcount.
Choose the rental term from the project schedule, not from the price you hope to see.
Yes, for the length of the closure, provided the lane is fully closed and the unit is clear of the work and the traffic plan. It is moved or removed when the closure lifts, and the move is booked in advance.
The move is timed for a closure change or a quiet period, and the new unit is set before the old one is removed. The plan is agreed with the contractor, so the crew knows when the move will happen.
A septage company does, under Michigan's Part 117 rules for septage. The service visits are timed between shifts, and the company's licence can be checked in the state's septage haulers directory.
The federal event guidance is aimed at public events and is generally not applied to a crew working alone. A worker who uses a wheelchair should still have a usable unit on a firm, level route, so ask the provider what the unit includes.
Once the closure schedule is known, so the moves can be planned against it. Call (888) 351-0294 with the closure dates, the shifts and the corridor, and the placement is worked out with the traffic plan.